In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
May 05, 2026 - 07:00 CDT
Scheduled - Cirrascale Cloud Services Customer Customer,

Please be advised of an upcoming scheduled planned maintenance event affecting our MDW01 (Chicago) Data center:

πŸ“… Date: 05/05/2026 – 06/05/2026

⏰ Time: 7:00 AM CST – 15:00 PM CST

πŸ“ Location: MDW01 (Chicago)

πŸ”§ Affected Services: CH2 20-Q-3 (N+1) Quarterly Cooling Tower Inspection

⚠️ Expected Impact: No disruption is anticipated, but the potential exists

What’s Happening?

Trained personnel with approved maintenance procedures will leverage best practices to perform this maintenance item. Back out procedures will be reviewed during pre-maintenance brief.

How You’ll Be Notified:

βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com

May 5, 2026 07:00 - Jun 4, 2026 15:00 CDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
May 05, 2026 - 04:00 CDT
Scheduled - Dear Cirrascale Cloud Services Customer,

Please be advised of an upcoming scheduled planned maintenance event affecting our MDW (Chicago) Data center:

πŸ“… Date:
May 05, 2026 – June 04, 2026
⏰ Time:
4:00 AM CST – 12:00 PM CST
πŸ“ Location:
MDW (Chicago)

πŸ”§ Affected Services:

There is no projected customer impact due to this maintenance

⚠️ Expected Impact:
No impact anticipated

What’s Happening?
This preventive Maintenance that will require all Electrical Distribution equipment to be thermally scanned with an infrared scanning device on an annual basis.


Reason for Work?
CH2 15-A-2 Annual Riser Bus Duct Component Thermal Scan

How You’ll Be Notified On The Day Of Planned Maintenance:
βœ… 1 day before maintenance – Reminder notification
βœ… 1 hour before maintenance – Final notification
βœ… After completion – "All Clear" message
Need Help?
Our team will actively monitor the situation and remain in contact. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com

May 5, 2026 04:00 - Jun 4, 2026 00:00 CDT
Austin (AUS01) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Charlotte (CLT01) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Chicago (MDW) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Chicago (ORD) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Cleveland (CLE) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Iceland (KEF) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Jacksonville (JAX) Operational
90 days ago
99.99 % uptime
Today
Internet Connectivity Operational
90 days ago
99.99 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Post-Maintenance Notice – Cogent Work Order Operational
90 days ago
100.0 % uptime
Today
Jakarta (CGK) Operational
90 days ago
100.0 % uptime
Today
Internet Connecvtivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Middletown (IAD) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
San Diego (SAN) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
San Jose (SJC) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Seattle (SEA) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Phoenix (PHX) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Operational
Degraded Performance
Partial Outage
Major Outage
Maintenance
Major outage
Partial outage
No downtime recorded on this day.
No data exists for this day.
had a major outage.
had a partial outage.

Scheduled Maintenance

SAN - ScaleMatrix - Strengthen Internet routing stability - Thursday, June 4th 12:00 PM CDT - Saturday, June 6th, 2026 at 01:59 CDT Jun 4, 2026 12:00 - Jun 6, 2026 01:59 CDT

Please be advised of an upcoming scheduled planned maintenance event affecting SAN Data Center:

πŸ“… Date: June 4th to June 6th

⏰ Time: 1200 PM CDT to 0159 AM CDT

πŸ“ Location: San Diego

πŸ”§ Affected Services: Internet

⚠️ Expected Impact: Client traffic is expected to continue routing through the remaining available border routers while the targeted router is drained and upgraded. No client action is required before or during this maintenance.

What’s Happening?

This maintenance is part of planned remediation work to strengthen Internet routing stability at the San Diego facility. The work will be performed across the border routing infrastructure in separate maintenance windows so each router can be upgraded, validated, and returned to normal operation in a controlled manner.

How You’ll Be Notified:

βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com


Thank you for your understanding and continued partnership.

Kenneth Gant

Posted on May 27, 2026 - 09:41 CDT

SEA01 - Centeris - #5055 CMOP#414 SHUTDOWN C-CD-B1 - 6/10/2026 0900 to 1800 CDT Jun 10, 2026 09:00-18:00 CDT

Please be advised of an upcoming scheduled planned maintenance event affecting SEA01 (Seattle) Data Center:

πŸ“… Date: 10/06/2026

⏰ Time: 9:00AM - 16:00PM CDT

πŸ“ Location: SEA01 (Seattle)

πŸ”§ Affected Services: PQM metering for multiple rows

⚠️ Expected Impact: There is no projected customer impact due to this maintenance

What’s Happening?

Trained personnel with approved maintenance procedures will leverage best practices to perform this maintenance item. Back out procedures will be reviewed during pre-maintenance brief.

How You’ll Be Notified:

βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com


Thank you for your understanding and continued partnership.

Posted on May 19, 2026 - 11:27 CDT

SAN - ScaleMatrix - Strengthen Internet routing stability - Thursday, June 11th 12:00 PM CDT - Saturday, June 13th, 2026 at 01:59 CDT Jun 11, 2026 12:00 - Jun 13, 2026 01:59 CDT

Please be advised of an upcoming scheduled planned maintenance event affecting SAN Data Center:

πŸ“… Date: June 11th to June 13th

⏰ Time: 1200 PM CDT to 0159 AM CDT

πŸ“ Location: San Diego

πŸ”§ Affected Services: Internet

⚠️ Expected Impact: Client traffic is expected to continue routing through the remaining available border routers while the targeted router is drained and upgraded. No client action is required before or during this maintenance.

What’s Happening?

This maintenance is part of planned remediation work to strengthen Internet routing stability at the San Diego facility. The work will be performed across the border routing infrastructure in separate maintenance windows so each router can be upgraded, validated, and returned to normal operation in a controlled manner.

How You’ll Be Notified:

βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com


Thank you for your understanding and continued partnership.

Kenneth Gant

Posted on May 27, 2026 - 09:49 CDT

PHX01- Digital Realty-Planned Maintenance Notification - Generator SAPM CMOP - June 15th, 2026 -June 30th, 2026, 8:00 AM - 6:00 PM CST Jun 15, 2026 08:00 - Jun 30, 2026 18:00 CDT

Please be advised of an upcoming scheduled planned maintenance event affecting our Phoenix (PH) Data center:

πŸ“… Date: June 15, 2026 - June 30, 2026

⏰ Time: 8:00 am CDT – 6:00 pm CDT

πŸ“ Location: Phoenix, AZ

πŸ”§ Affected Services: CPBG Cummins Generator SAPM CMOP

⚠️ Expected Impact: No impact anticipated

What’s Happening?

A load will be applied to Generator. Generator supports mechanical equipment only and no direct COLO space.

Reason for work?

Although no impact is expected, redundancy reduced


How You’ll Be Notified On The Day Of Planned Maintenance:

βœ… 1 day before maintenance – Reminder notification

βœ… 1 hour before maintenance – Final notification

βœ… After completion – "All Clear" message

Need Help?

Our team will actively monitor the situation and remain in contact. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com

Thank you for your understanding and continued partnership.

Posted on May 22, 2026 - 17:24 CDT

MDW01 - CoreSite Maintenance Notification - CoreSite CH2 - 06/29/2026 to 07/29/2026 - 4:00 AM to 12:00 PM Jun 29, 2026 04:00 - Jul 29, 2026 12:00 CDT

Please be advised of an upcoming scheduled planned maintenance event affecting our MDW01 (Chicago) Data center:

πŸ“… Date: 06/29/2026 – 07/29/2026

⏰ Time: 4:00 AM CST – 12:00 PM CST

πŸ“ Location: MDW01 (Chicago)

πŸ”§ Affected Services: CH2 full site

Risk: Low

Maintenance Type: Scheduled Maintenance

Reason for Work: CH2 4-A-3 (2N) Annual UPS Battery Inspection (Li-Ion Batteries Only)

Risk Mitigation: Trained personnel with approved maintenance procedures will leverage best practices to perform this maintenance item. Back out procedures will be reviewed during pre-maintenance brief.

This Preventative Maintenance will verify the condition of the Lithium-Ion (Li-Ion) battery strings. Per IEEE guidelines, battery maintenance should be performed with the battery string online.

How You’ll Be Notified:

βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com

Posted on Jun 01, 2026 - 16:18 CDT
Jun 2, 2026
Completed - The scheduled maintenance has been completed.
Jun 2, 03:15 CDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 1, 22:00 CDT
Scheduled - Please be advised of an upcoming scheduled planned maintenance event affecting MDW01 (Chicago) Data Center:

πŸ“… Date: 6/1/2026 10:00 PM to 6/2/2026 3:15 AM

⏰ Time: 6/1/2026 10:00 PM to 6/2/2026 3:15 AM

πŸ“ Location: MDW01 (Chicago)

πŸ”§ Affected Services: COR.03

⚠️ Expected Impact: : Interruption to primary access.

What’s Happening?

Best practice and procedures will be employed throughout this event and we would like to ensure that all relevant tenants are aware of the activity.

The cloud service provider, GCP, will be carrying out a maintenance on our LAG interconnects in the US central 1 region. For the duration of the maintenance event, you should expect BGP sessions on any hosted connection that use these Interconnects to be down.

How You’ll Be Notified:

βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com


Thank you for your understanding and continued partnership.

Sai Kiran Addetla.

May 4, 17:03 CDT
Jun 1, 2026
Completed - The scheduled maintenance has been completed.
Jun 1, 18:00 CDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 1, 10:45 CDT
Scheduled - Please be advised of an upcoming scheduled planned maintenance event affecting SEA01 (Seattle) Data Center:

πŸ“… Date: 1/06/2026

⏰ Time: 9:00AM - 18:00PM CDT

πŸ“ Location: SEA01 (Seattle)

πŸ”§ Affected Services: PQM metering for multiple rows

⚠️ Expected Impact: There is no projected customer impact due to this maintenance

What’s Happening?

Trained personnel with approved maintenance procedures will leverage best practices to perform this maintenance item. Back out procedures will be reviewed during pre-maintenance brief.

How You’ll Be Notified:

βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com


Thank you for your understanding and continued partnership.

Jun 1, 10:44 CDT
May 31, 2026
Completed - The scheduled maintenance has been completed.
May 31, 00:00 CDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
May 18, 10:00 CDT
Scheduled - Please be advised of an upcoming scheduled planned maintenance event affecting MDW01 (Chicago) Data Center:

πŸ“… Date: 30/04/2026 - 30/05/2026

⏰ Time: 7:00AM - 15:00PM CST

πŸ“ Location: MDW01 (Chicago)

πŸ”§ Affected Services: CH2 20-A-1

⚠️ Expected Impact: There is no projected customer impact due to this maintenance

What’s Happening?

Trained personnel with approved maintenance procedures will leverage best practices to perform this maintenance item. Back out procedures will be reviewed during pre-maintenance brief.

How You’ll Be Notified:

βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com


Thank you for your understanding and continued partnership.

May 18, 09:29 CDT
May 30, 2026
Completed - The scheduled maintenance has been completed.
May 30, 17:01 CDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Apr 30, 09:00 CDT
Scheduled - Dear Customer,
Please be advised of an upcoming scheduled planned maintenance event affecting our MDW01 (Chicago) Data center:

πŸ“… Date: 30/04/2026 – 30/05/2026

⏰ Time: 7:00 AM CST – 15:00 PM CST

πŸ“ Location: MDW01 (Chicago)

πŸ”§ Affected Services: CH2 20-Q-4 (N+1) Quarterly Chiller Inspection

⚠️ Expected Impact: No disruption is anticipated, but the potential exists

What’s Happening?

Trained personnel with approved maintenance procedures will leverage best practices to perform this maintenance item. Back out procedures will be reviewed during pre-maintenance brief.

How You’ll Be Notified:

βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com

Apr 1, 05:53 CDT
Completed - The scheduled maintenance has been completed.
May 30, 17:00 CDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Apr 30, 09:00 CDT
Scheduled - Please be advised of an upcoming scheduled planned maintenance event affecting MDW01 (Chicago) Data Center:

πŸ“… Date: 30/04/2026 - 30/05/2026

⏰ Time: 7:00AM - 15:00PM CST

πŸ“ Location: MDW01 (Chicago)

πŸ”§ Affected Services: CH2 20-A-2

⚠️ Expected Impact: There is no projected customer impact due to this maintenance

What’s Happening?

Trained personnel with approved maintenance procedures will leverage best practices to perform this maintenance item. Back out procedures will be reviewed during pre-maintenance brief.

How You’ll Be Notified:

βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com


Thank you for your understanding and continued partnership.

Apr 1, 06:22 CDT
Completed - The scheduled maintenance has been completed.
May 30, 17:00 CDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Apr 30, 09:00 CDT
Scheduled - Please be advised of an upcoming scheduled planned maintenance event affecting MDW01 Data Center: MDW01 Chicago

πŸ“… Date: 2026-04-30 - 2026-05-30

⏰ Time: 7:00AM - 15:00PM CST

πŸ“ Location: MDW01

πŸ”§ Affected Services: This Preventative Maintenance will check operation of HVAC equipment.

⚠️ Expected Impact: No disruption is anticipated, but the potential exists

What’s Happening?

This Preventative Maintenance will check operation of HVAC equipment.

How You’ll Be Notified:

βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com


Thank you for your understanding and continued partnership.

Apr 1, 05:27 CDT
Completed - The scheduled maintenance has been completed.
May 30, 12:00 CDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Apr 30, 04:00 CDT
Scheduled - Cirrascale Cloud Services Customer Customer,

Please be advised of an upcoming scheduled planned maintenance event affecting our MDW01 (Chicago) Data center:

πŸ“… Date: 04/30/2026 – 05/30/2026

⏰ Time: 4:00 AM CST – 12:00 PM CST

πŸ“ Location: MDW01 (Chicago)

πŸ”§ Affected Services: CH2 20-Q-4 (N+1) Quarterly Chiller Inspection

⚠️ Expected Impact: No disruption is anticipated, but the potential exists

What’s Happening?

This preventative maintenance procedure will thoroughly inspect and verify the proper operation of the chillers, ensuring optimal performance and reliability

How You’ll Be Notified:

βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com

Apr 28, 03:54 CDT
May 29, 2026
Completed - The scheduled maintenance has been completed.
May 29, 23:59 CDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
May 27, 05:00 CDT
Scheduled - Please be advised of an upcoming scheduled planned maintenance event affecting our Jacksonville (JAX01) Data center:

πŸ“… Date: May 27, 2026 - May 29, 2026

⏰ Time: 11:00 am CDT – 11:30 am CDT

πŸ“ Location: Jacksonville, FL

πŸ”§ Affected Services: Electrical Capacity Expansion

⚠️ Expected Impact: No impact anticipated

What’s Happening?

The replacement or upgrade of component(s) within the A side of the emergency power critical infrastructure, along with the verification of proper operation and functionality of the new generator and UPS.

Reason for work?

Although no impact is expected, this activity involves work on the A-side power infrastructure. Customers are encouraged to confirm that all dual-corded devices are utilizing both A and B power feeds to maintain intended redundancy throughout the maintenance period.


How You’ll Be Notified On The Day Of Planned Maintenance:

βœ… 1 day before maintenance – Reminder notification

βœ… 1 hour before maintenance – Final notification

βœ… After completion – "All Clear" message

Need Help?

Our team will actively monitor the situation and remain in contact. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com

Thank you for your understanding and continued partnership.

May 21, 14:18 CDT
May 28, 2026

No incidents reported.

May 27, 2026
May 26, 2026

No incidents reported.

May 25, 2026

No incidents reported.

May 24, 2026
Completed - The scheduled maintenance has been completed.
May 24, 15:00 CDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Apr 24, 07:00 CDT
Scheduled - Dear Cirrascale Cloud Services Customer,

Please be advised of an upcoming scheduled planned maintenance event affecting our MDW (Chicago) Data center:

πŸ“… Date:
April 24, 2026 7:00 AM CST – May 24, 2026 3:00 PM CST
πŸ“ Location:
MDW (Chicago)

πŸ”§ Affected Services:

There is no projected customer impact due to this maintenance

⚠️ Expected Impact:
No impact anticipated

What’s Happening?
This is a Preventive Maintenance that will require the ATS to be operated in all modes (emergency, bypass, normal).

Reason for Work?
CH2 6-A-1 Annual ATS Inspection

How You’ll Be Notified On The Day Of Planned Maintenance:
βœ… 1 day before maintenance – Reminder notification
βœ… 1 hour before maintenance – Final notification
βœ… After completion – "All Clear" message
Need Help?
Our team will actively monitor the situation and remain in contact. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com

Apr 8, 23:11 CDT
May 23, 2026

No incidents reported.

May 22, 2026
Completed - The scheduled maintenance has been completed.
May 22, 05:00 CDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
May 21, 23:00 CDT
Scheduled - Please be advised of an upcoming scheduled planned network maintenance event affecting JAX01 Jacksonville Data Center Data Center:

πŸ“… Date: 05/21/2026 - 05/22/2026

⏰ Time: 11:01PM CST - 05:00AM CST

πŸ“ Location: JAX01 Jacksonville Data Center Data Center

πŸ”§ Affected Services: Customers may experience latency and packet loss intermittently

⚠️ Expected Impact: During this maintenance window, you may experience two or more interruptions in service while we complete the maintenance activities. However, due to the complexity of the work, your downtime may be longer. Customers may experience latency and packet loss intermittently throughout the window.


What’s Happening?

Cogent Internet Provider will be to applying and activating software module upgrades on code running on the edge routers per the manufacturer's recommendations.


How You’ll Be Notified:

βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com


Thank you for your understanding and continued partnership.

May 13, 14:30 CDT
May 21, 2026
May 20, 2026

No incidents reported.

May 19, 2026

No incidents reported.