Cirrascale Cloud Services
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 01, 2025 - 08:00 CST
Scheduled - Please be advised of an upcoming scheduled planned maintenance event affecting our SAN (San Diego) Data Center:
πŸ“… Date: December 1, 2025 – December 16, 2025
⏰ Time: 8:00 AM CST – 1:00 AM CST
πŸ“ Location: SAN (San Diego)
πŸ”§ Affected Services: UPS Maintenance
⚠️ Expected Impact: No disruption is anticipated, but the potential exists.
What’s Happening?
CCS Data Center Partner will be performing a combination of annual UPS maintenance and targeted UPS system upgrades designed to further improve:
β€’ Power redundancy and resiliency
β€’ Operational efficiency of power delivery
β€’ Long-term capacity and scalability of the San Diego site

How You’ll Be Notified:
βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.
Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com

Thank you for your understanding and continued partnership.

Cirrascale Cloud Services
Email - support@cirrascale.com
Web - http://www.cirrascale.com

Dec 1, 2025 08:00 - Dec 16, 2025 01:00 CST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 30, 2025 - 04:00 CST
Scheduled - Dear Customer,

Please be advised of an upcoming scheduled planned maintenance event affecting our MDW (Chicago) Data center:

πŸ“… Date:
Nov 30, 2025 – Dec 30, 2025
⏰ Time:
4:00 AM CST – 12:00 PM CST
πŸ“ Location:
MDW (Chicago)

πŸ”§ Affected Services:

CH2 20-A-1 CRAH/AHU

⚠️ Expected Impact:
No impact anticipated

What’s Happening?
Trained personnel with approved maintenance procedures will leverage best practices to perform this maintenance item. Back out procedures will be reviewed during pre-maintenance brief.

Asset Assigned To (Record Type & Equipment Type):

o Air Conditioner, Air Handler

o Air Conditioner, Compressor

o Air Conditioner, CRAC

o Air Conditioner, CRAH

o Air Conditioner, Dry Cooler

o Air Conditioner, In Row Cooler

o Air Conditioner, Packaged Roof Top Unit

o Air Conditioner, Variable Air Volume System

Β· How to Schedule (1-to-1, Group, Route): Group

Β· Should Customer Be Notified: Yes

Β· Worked Performed by: Qualified CoreSite staff or Qualified Vendor





Annual inspection includes the following:

Β· All steps performed in quarterly inspection.





For CRAC, CRAH units or RTU:

Β· Check and brush-clean cooling fins, as necessary.

Β· Check suction discharge and oil pressures, where accessible.

Β· For CRAC and CRAH units:

o Check and brush-clean cooling fins, as necessary.

o Preform an acid wash of the condenser if required.

o Perform insulation resistance test on fan motors, report if under 2M ohms.

Β· For units with humidification systems:

o Replace internal cylinder, as necessary.

If installed, verify variable frequency drives (VFDs) are operating properly and set point are set per manufacturer’s recommendation.





For heat pumps:

Β· Check systems for proper operation.

Β· Check programmable stat.

Β· Check coil condition, clean outdoor coils.

Β· Check control set points.

Β· Check safeties.

Β· Check expansion valves.

Β· Check reversing valve.

Β· Check crankcase heater for proper operation.

Β· Check unit charge.

Β· Check evaporator TD.

Β· Check condensate pan and drain. Check trap for obstructions.

Β· Check for satisfactory belt, drive, and fan conditions.

Β· Check for proper fan rotation.

Β· Visual inspection of alignment.

Β· Check contactor and points.

Β· Check orifices and nozzles.

Β· Check motor operation.

Β· Lubricate as required.

Β· Check for satisfactory motor bearings conditions, oil as required.

Β· If installed, verify variable frequency drives (VFDs) are operating properly and set point are set per manufacturer’s recommendation.

Β· Restart unit in a safe an approved manner

Β· Verify unit is operating properly.




For rooftop condensers or dry coolers:

Β· Clean coils with water and special cleaner (typically done in the spring and fall).

Β· Verify piping is secure.

Β· Check for proper voltage and amperage draw on fan motors.

Β· Check fan for damage and excessive vibration.

Β· Check electrical connections (tighten as necessary), contacts, and fuses.

Β· If installed, verify variable frequency drives (VFDs) are operating properly and set point are set per manufacturer’s recommendation.

Β· Change all drive belts, as necessary.




For fan coil units:

Β· Inspect, clean, and tighten all electrical connections and wiring.

Β· Visually inspect the entire unit casing for chips or corrosion. Remove rust or corrosion and repaint surfaces.

Β· Clean fan wheels and fan shaft. Remove any rust from the fan shaft with emery cloth and recoat with L.P.S. 3 or equivalent.

Β· Inspect the drain pan for sludge or other foreign material. Clear the drain openings and drain line to ensure adequate flow.

Β· Rotate the fan wheel and check for obstructions in the fan housing. The wheel should not rub on the fan housing or cutoff. Adjust to center if necessary and tighten the wheel set screws per the torque recommendations.

Β· Examine flex connector for cracks or leaks.

Β· If installed, verify variable frequency drives (VFDs) are operating properly and set point are set per manufacturer’s recommendation.

Β· Repair or replace any damaged duct material..

How You’ll Be Notified On The Day Of Planned Maintenance:
βœ… 1 day before maintenance – Reminder notification
βœ… 1 hour before maintenance – Final notification
βœ… After completion – "All Clear" message
Need Help?
Our team will actively monitor the situation and remain in contact. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com

Nov 30, 2025 04:00 - Dec 30, 2025 12:00 CST
Austin (AUS01) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Charlotte (CLT01) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Chicago (MDW) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Chicago (ORD) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Cleveland (CLE) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Iceland (KEF) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Jacksonville (JAX) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Jakarta (CGK) Operational
90 days ago
100.0 % uptime
Today
Internet Connecvtivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Middletown (IAD) Under Maintenance
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Under Maintenance
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
San Diego (SAN) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
San Jose (SJC) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Seattle (SEA) Operational
90 days ago
100.0 % uptime
Today
Internet Connectivity Operational
90 days ago
100.0 % uptime
Today
Power Infrastructure Operational
90 days ago
100.0 % uptime
Today
Cooling Infrastructure Operational
90 days ago
100.0 % uptime
Today
As-A-Service Connectivity Operational
90 days ago
100.0 % uptime
Today
Operational
Degraded Performance
Partial Outage
Major Outage
Maintenance
Major outage
Partial outage
No downtime recorded on this day.
No data exists for this day.
had a major outage.
had a partial outage.

Scheduled Maintenance

IAD01 - CCS Maintenance Notification - Power System Testing (12/8/25 –12/12/25) Dec 8, 2025 07:00 - Dec 12, 2025 16:00 CST

Update - We will be undergoing scheduled maintenance during this time.
Oct 31, 2025 - 14:51 CDT
Scheduled - Dear Customer,
Please be advised of an upcoming scheduled planned maintenance event affecting our IAD (Middletown) Data Center:

πŸ“… Date: December 8, 2025 – December 12, 2025
⏰ Time: 7:00 AM CST – 4:00 PM CST
πŸ“ Location: IAD (Middletown, VA)
πŸ”§ Affected Services: Generator (Power System Maintenance)
⚠️ Expected Impact: No disruption is anticipated, but the potential exists.

What’s Happening?
CCS Data Center Partner will perform planned power system maintenance from Monday, December 8 through Friday, December 12, 2025, between 8:00 AM and 5:00 PM EST. During this time, facility load will be transferred from utility power to generator power for testing.

All customer equipment will remain supported by UPS systems, and no service impact is expected. However, as with any power transition, a minimal inherent risk exists. CCS Data Center Partner staff will closely monitor all systems and take immediate action if any irregularities occur.

No customer action is required, though we recommend avoiding major maintenance or power-sensitive changes during this period.

How You’ll Be Notified:
βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com


Thank you for your understanding and continued partnership.

James Cobb
Network Operations Manager
Cirrascale Cloud Services
Email - support@cirrascale.com
Web - http://www.cirrascale.com
For additional information, please visit the following link to your Jira ticket: Requests - Jira Service Management

Oct 31, 2025 - 14:48 CDT

IAD01 - CCS Maintenance Notification - Generator Maintenance Dec 8, 2025 07:00 - Dec 12, 2025 16:00 CST

Update - We will be undergoing scheduled maintenance during this time.
Nov 04, 2025 - 19:06 CST
Scheduled - Dear Customer,
Please be advised of an upcoming scheduled planned maintenance event affecting our IAD (Middletown) Data Center:

πŸ“… Date: December 8, 2025 – December 12, 2025
⏰ Time: 7:00 AM CST – 4:00 AM CST
πŸ“ Location: IAD (Middletown, VA)
πŸ”§ Affected Services: Generator Maintenance
⚠️ Expected Impact: No disruption is anticipated, but the potential exists.

What’s Happening?
CCS Data Center Partner will conduct a test that involves transferring the facility load from utility power to generator power. During the transfer, all customer equipment will remain supported by Uninterruptible Power Supply (UPS) systems to ensure continuity. No interruption is expected. However, customers should be aware that any transition between power sources carries a minimal risk of disruption. In the event of an unexpected utility failure during the maintenance window, the load will be automatically transferred to reserve generators.

How You’ll Be Notified:
βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.
Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com

Thank you for your understanding and continued partnership.
Connor Taylor
Network Operations Supervisor
Cirrascale Cloud Services
Email - support@cirrascale.com

Nov 04, 2025 - 19:05 CST

CLT - CL4 - Mechanical Maintenance - UHD Cabinets - (12/08/2025 - 7 AM - 4 PM) Dec 8, 2025 07:00-16:00 CST

Please be advised of an upcoming scheduled planned maintenance event affecting Charlotte Data Center:

πŸ“… Date: 12/08/2025

⏰ Time: 7 AM - 4PM

πŸ“ Location: Charlotte

πŸ”§ Affected Services: Cooling

⚠️ Expected Impact: No disruption is anticipated, but the potential exists

What’s Happening?

TierPoint will perform CL4 - Mechanical Maintenance - UHD Cabinets (Phase 5) on the above-mentioned date and time which includes: The multi-day activities associated with the changing of water flow by valve operation, along with the verification of proper operation and functionality of the flow of water in the affected cabinets. The actions involved are fully documented and may include the use of external vendors.

How You’ll Be Notified:

βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com


Thank you for your understanding and continued partnership.

Chris Nichols

Posted on Dec 04, 2025 - 21:38 CST

MDW01 - CCS Maintenance Notification - Testing of pumping packages and cooling loops.( 2025-12-31 ) - ( 2026-01-30) Dec 31, 2025 06:00 - Jan 30, 2026 14:00 CST

Cirrascale Scheduled Planned Maintenance Notice

Dear Customer,

Please be advised of an upcoming scheduled planned maintenance event affecting our MDW Data Center:

πŸ“… Date: December 31, 2025 – January 30, 2025
⏰ Time: 6:00 AM CST – 2:00 PM CST
πŸ“ Location: MDW (Chicago, IL)
πŸ”§ Affected Services: This Preventative Maintenance will check operation of pumping packages. It will also require a test of the cooling loops.
⚠️ Expected Impact: No disruption is anticipated, but the potential exists.

What’s Happening?

Our CCS data center partner will perform this Preventative Maintenance and will check operation of HVAC pumping packages. It will also require a test of the cooling loops. This maintenance will have an internal notification and will be performed by qualified CCS data center partner staff or Qualified Vendor.

Β· Asset Assigned To (Record Type & Equipment Type): Pump

Β· How to Schedule (1-to-1, Group, Route): Group

Β· Should Customer Be Notified: Yes

Β· Worked Performed by: Qualified CCS Data Center staff



Annual inspection includes the following:

Β· All steps performed in quarterly inspection.

Β· Test changeover operation of pump package.

Β· Check for proper voltage and amperage draw on pump motors.

Β· Check electrical connections (tighten as necessary), contacts and fuses.

Β· Check coolant loop expansion tanks for correct operating pressures.

Β· Check coolant loop make up tank and pump operation.

Our team will actively monitor the situation and remain in contact.

How You’ll Be Notified On The Day Of Planned Maintenance:

βœ… 1 day before maintenance – Reminder notification
βœ… 1 hour before maintenance – Final notification
βœ… After completion – "All Clear" message

Need Help?
Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com
Thank you for your understanding and continued partnership.

Posted on Dec 02, 2025 - 07:07 CST
Dec 6, 2025

No incidents reported today.

Dec 5, 2025

No incidents reported.

Dec 4, 2025
Completed - The scheduled maintenance has been completed.
Dec 4, 18:00 CST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 4, 10:00 CST
Scheduled - Dear Customer,

Please be advised of an upcoming scheduled planned maintenance event affecting Jacksonville (JAX01) Data Center:

πŸ“… Date: December 4, 2025

⏰ Time: Full-day maintenance window

πŸ“ Location: Jacksonville, FL (JAX01)

πŸ”§ Affected Services: DCIM transition activities

⚠️ Expected Impact: No disruption is anticipated, but the potential exists

What’s Happening?

Data Center Infrastructure Management (DCIM) Ownership Transition (Effective December 1, 2025)
TierPoint is targeting December 1, 2025, as the effective takeover date for the DCIM environment in Jacksonville. ScaleMatrix will continue to provide support throughout the transition period.

During this window, please ensure:
β€’ Cabinets are not left open unless tied to a physical/mechanical condition.
β€’ If a cabinet must remain open due to a mechanical issue, please open a ticket with the EOC for immediate routing and resolution.

How You’ll Be Notified:

βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com

Thank you for your understanding and continued partnership.

Said Noor
Network Operations Technician
Cirrascale Cloud Services

Nov 26, 21:51 CST
Completed - The scheduled maintenance has been completed.
Dec 4, 18:00 CST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 4, 10:01 CST
Scheduled - Dear Customer,

Please be advised of an upcoming scheduled planned maintenance event affecting Charlotte (CLT) Data Center:

πŸ“… Date: December 4, 2025

⏰ Time: Full-day maintenance window

πŸ“ Location: Charlotte, NC (CLT)

πŸ”§ Affected Services: Cooling infrastructure, DCIM transition activities

⚠️ Expected Impact: No disruption is anticipated, but the potential exists

What’s Happening?

Charlotte Cooling Loop Integration (December 4, 2025)
We will be opening a change to tie the legacy cooling loop (Rows 1–4) in Charlotte into the closed-loop system.

Data Center Infrastructure Management (DCIM) Ownership Transition (Effective December 1, 2025)
TierPoint is targeting December 1, 2025, as the effective takeover date for the DCIM environment in Charlotte. ScaleMatrix will continue to provide support throughout the transition period.

During this window, please ensure:

Cabinets are not left open unless tied to a physical/mechanical condition.

If a cabinet must remain open due to a mechanical issue, please open a ticket with the EOC for immediate routing and resolution.

How You’ll Be Notified:

βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com

Thank you for your understanding and continued partnership.



Said Noor Β 

Network Operations Technician Β 

Cirrascale Cloud Services

Nov 26, 21:15 CST
Dec 3, 2025
Completed - The scheduled maintenance has been completed.
Dec 3, 16:00 CST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 3, 08:00 CST
Scheduled - Dear Customer,

Please be advised of an upcoming scheduled planned maintenance event affecting Charlotte Data Center:

πŸ“… Date: 12/03/2025

⏰ Time: 8:00AM - 4:00PM

πŸ“ Location: Charlotte - 4, NC

πŸ”§ Affected Services: CL4 - Chiller Plant

⚠️ Expected Impact: No disruption is anticipated, but the potential exists

What’s Happening?

CL4 - Chiller Plant Maintenance on the above-mentioned date and time which includes: The quarterly visual inspection, cleaning, adjustment and verification of the proper operation and functionality of the Chilled Water Plant and related infrastructure in production. The actions involved are fully documented and may include the use of external vendors.

How You’ll Be Notified:

βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.

Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com


Thank you for your understanding and continued partnership.

Nov 20, 17:45 CST
Dec 2, 2025
Completed - The scheduled maintenance has been completed.
Dec 2, 18:00 CST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Dec 2, 07:00 CST
Scheduled - Please be advised of an upcoming scheduled planned maintenance event affecting our JAX (Jacksonville) Data Center:
πŸ“… Date: December 2, 2025 – December 2, 2025
⏰ Time: 7:00 AM CST – 6:00 PM CST
πŸ“ Location: JAX (Jacksonville)
πŸ”§ Affected Services: Generator Maintenance - w/Load Bank
⚠️ Expected Impact: No disruption is anticipated, but the potential exists.
What’s Happening?
CCS Data Center Partner will conduct an annual load bank testing of the emergency power generation systems and related components followed by the verification of proper operation and functionality
How You’ll Be Notified:
βœ… Initial Notification – Sent upon scheduling of the upcoming maintenance work.
βœ… 1-Hour Reminder – A reminder notification is sent one hour before the start of the maintenance window.
βœ… Start Notification – Issued at the beginning of the maintenance to confirm that the work is underway.
βœ… Completion Notification ("All Clear") – Sent once maintenance is complete and all services are confirmed to be operational.
Our team will actively monitor the situation and remain in contact with the CCS Data Center Partner. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com

Thank you for your understanding and continued partnership.

Cirrascale Cloud Services
Email - support@cirrascale.com
Web - http://www.cirrascale.com

Nov 23, 02:58 CST
Dec 1, 2025

Unresolved incident: SAN01 - ScaleMatrix SAN UPS Maintenance (12/1/2025 - 8:00AM CST - 12/16/2025 1:00AM CST).

Nov 30, 2025

Unresolved incident: MDW01 - CCS Maintenance Notification (CH2 20-A-1 CRAH/AHU) (PM Date 2025-11-30 - 2025-12-30).

Nov 29, 2025

No incidents reported.

Nov 28, 2025
Completed - The scheduled maintenance has been completed.
Nov 28, 12:00 CST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Nov 3, 04:00 CST
Scheduled - Dear Customer,
Please be advised of an upcoming scheduled planned maintenance event affecting our MDW (Chicago) Data center:

πŸ“… Date:
November 03, 2025 – November 28, 2025
⏰ Time:
4:00 AM CST – 12:00 PM CST
πŸ“ Location:
MDW (Chicago)

πŸ”§ Affected Services:

CH2 20-Q-4 (N+1) Quarterly Chiller Inspection

⚠️ Expected Impact:
No impact anticipated

What’s Happening?
Trained personnel with approved maintenance procedures will leverage best practices to perform this maintenance item. Back out procedures will be reviewed during pre-maintenance brief.

Description: This Preventative Maintenance will check operation of chillers.

How You’ll Be Notified On The Day Of Planned Maintenance:
βœ… 1 day before maintenance – Reminder notification
βœ… 1 hour before maintenance – Final notification
βœ… After completion – "All Clear" message
Need Help?
Our team will actively monitor the situation and remain in contact. Should you have any concerns, please reach out:
πŸ“§ support@cirrascale.com

Oct 13, 05:21 CDT
Nov 27, 2025

No incidents reported.

Nov 26, 2025

No incidents reported.

Nov 25, 2025

No incidents reported.

Nov 24, 2025

No incidents reported.

Nov 23, 2025

No incidents reported.

Nov 22, 2025

No incidents reported.